HBP Ltd was engaged by EMCOR UK to deliver a package of remedial and improvement works on a publicly accessible route adjacent to Michaelson Road in Barrow-in-Furness.
The work includes:
The project was delivered in a live public environment and required careful management of traffic, pedestrian movement, and local stakeholders. All works were delivered under our ISO 9001, 14001, and 45001-certified Integrated Management System, with project-specific controls including RAMS, a Traffic Management Plan (TMP), and a bespoke quality checklist for stonework and surfacing.
To manage risks associated with working near live traffic and public interfaces, our team engaged early in the design and planning stages. This allowed us to shape a phased delivery programme and implement suitable controls to minimise disruption. Traffic-sensitive activities, including drainage excavations and surfacing, were completed under full road closures, with clearly signed diversions and managed access in line with the TMP.
We actively engaged with local stakeholders to minimise disruption. To provide ongoing liaison and a route to raise queries or concerns, our Project Manager issued 24/7 contact details to local residents and businesses during mobilisation. Our operations were tailored to minimise impact, with daily checks carried out to maintain safe pedestrian routes, especially for school traffic and vulnerable users. Where a MEWP (Mobile Elevated Work Platform) was required for wall works along the road bridge slip road, we coordinated closely with the business owner to manage noise, access, and minimise operational disruption.
Reclaimed coping stones were transported to our inert waste facility, where they were crushed and recycled into Type 1 MOT. This supported our closed-loop materials approach, reducing waste and maximising reuse. The project was delivered on time, with zero RIDDORs or unresolved defects.
Cornmill Sidings demonstrates our ability to plan and deliver public realm improvement works in live environments, with robust access controls, stakeholder management, and quality outcomes. Our relevant experience to be applied on Lot 2 includes: